Edit Region7

Home | About us | Contact us

Copyright 2008 @ NWFP Agricultural University, Peshawar - Pakistan

Directorate of Works
The Works Directorate is responsible for new constructions, and repairs/ maintenance of the already constructed buildings and roads throughout the campus of the NWFP Agricultural University and sometime of the neighboring areas, including the residences of faculty and staff of this University on the campus of the University of Peshawar.
At the time of merger of research system with the university, the Directorate of Works was also responsible for the said works of the whole research setup throughout the province.

The University currently comprise of the following areas

Area of Campus = 70.00 Acrs
Area of Farm Center = 327.00 Acrs
Area of Houses at IDS Colony = 13.75 Acrs
Area of Houses at UOP campus = 15.61 Acrs
Area of Khuwar = 37.00 Acrs
Total area = 463.36 Acrs
Build-up area = 21.12 Acrs (Annex – “A”)
Open area = 442.23 Acrs

Scope of the Works Directorate:

Look after and maintenance of the existing 13,30,865 sq. feet residential and non-residential buildings.
Maintenance of high power and sophisticated electrical installations like twelve transformers connected with two sub-stations.
Maintenance of Water supply system of the university, which consists of three tube wells, two overhead and two underground water reservoirs, kilometers long pipelines etc. These services are provided round the clock.
Maintains a high quality underground sewerage system with conventional ? septic tank/soakage pit type and modern ? two each Lift Stations and Sewerage Treatment Plants (STP), sewerage facilities.
Maintaining two types of telephone facilities i.e. direct NTC connections and 300 lines PABX telephone exchange. The PABX telephone exchange has been providing facilities both in the morning and 2nd shits.
Maintenance of 12 Nos Roof top and more than hundred windows type room air conditioners.
Maintained of generators for tube wells, telephone exchange and other important functionaries in case of electric shut downs.
Maintenance of 13 Nos FTRs (heating system) in the newly constructed buildings.
Maintenance of kilometers long roads (spread over colonies, offices, hostels and farm) leading to and fro residential and non-residential buildings including one main bridge and one pedestrian bridge on khuwar.
Provision of hot water facilities through boiler plants and geysers for residential and non-residential buildings and cooking ranges in the residences.
Assessment of houses/buildings for House Requisition/Subsidy and House Building Loans.
Billing/recovery of Electric and Sui Gas from the different residential and non-residential consumers.
Maintenance of different kinds and types of furniture of residential and non-residential buildings.
Works Store: The Works Directorate is maintaining a Works Store under the supervision of the Maintenance Division. The division is responsible for purchase and issue of store items.
Complaint Cell: A full fledge round the clock Complaint Cell is being maintained by the Works Directorate. All sorts of routine complaints are received here during the morning shift while the 2nd and 3rd shifts are being carried out emergency complaints.
The Construction Division of the Directorate is involved in new construction works in the residential and non-residential buildings on campus.
Under the new buildings the Works Directorate is provided with some workshop facilities where the worker of the Directorate perform their works needed at the workshop.

Completed Project:

On Campus:
1) Construction of IDS Building & IDS Colony
2) Construction of Bachelor Hostel
3) Construction of different B, C, D, E & G Type Houses
4) Construction of Shopping Centers
5) Construction of Water Management Block
6) Construction of Works & Operation Building
7) Barbed wire fencing around Farm Center
8) Construction of Bridge over Khwar
9) Construction of Dairy Farm Sheds
10) Construction of Agric. Univ. Public School &College (both for Girls & Boys)
11) Construction of Mosques on campus
12) Boring and Development of Tube Wells
13) Construction of Agricultural Mechanization Block (Phase-I)
14) Construction of buildings for Institute of Biotechnology & Genetic Engineering
15) Construction of Dhobi Ghat
16) Construction of First Floor in AUPS&C (Boys)
17) Protection work of bridge at AUP
18) Resurfacing of road on campus
19) Brick tiles on roof of different category houses on campus
20) Purchase of furniture for different buildings/units

OFF Campus:
1) AM&R at different Research Institutes / Stations throughout the province
2) Up-gradation of ARS to ARI at Mingora
3) Up-gradation of ARSS to ARS at Ahmadwala, Karak
4) Up-gradation of ARSS to ARS at Dhodial Mansehra
5) Construction of buildings for SCRF, Jabban, Malakand
6) Construction of Water supply system and protection wall at SRF, Surezai
7) Construction of Buildings for NODP and Tissue Culture Lab at ARI, Tarnab
8) Construction of Bachelor Hostel and Banglows at ARI, DIKhan
9) Construction of ARS, Chitral
10) Construction of Barani Agricultural Research Station at Kohat
11) Construction of ARSS at Booni, Chitral

The Works Directorate also had major part in planning and supervising the construction component of the TIPAN Project under which building worth 4,22,680.00 Sq. ft and related infrastructure were constructed.

Projects in Pipeline (in progress or will start shortly):
Construction of 3-story block in AUPS (Girls)
Construction of Class-IV colony (G-Type Quarters)
Strengthening of Teaching and Research Capability of Faculty of Animal Husbandry and Veterinary Sciences, NWFP Agricultural University, Peshawar.
Master PC-1 of the University amounting to Rs.3.00 billion submitted to HEC

Participation of Faculty/Students in Seminars, Workshops and Other Events:
  Not Applicable

Awards/Honours Received by the Faculty /Students:
  Not Applicable

Functions Held by the Department
The Works Directorate is involved in the arrangements phase of all the functions like Convocation, Seminars, and Workshops etc. being held by different quarters of the University.

Extra Curricular Activities:
  Not Applicable

Academic Achievements:
  Not Applicable

Papers/Books published:
  Nil

Contacts:

Director of Works:
S.Lutfur Rahman
Off .Telephone: +92-091-9216524 Ext: 3145
Res: +92-091-9216424
E-mail: ---
Office No: 03

Sub Divisional Officer:
Muhammad Daud Khan
Off .Telephone: +92-091-9216524 Ext: 3152
Res: +92-091-5823942
E-mail: ---
Office No: 07

Sub Divisional Officer:
Ramazan Ali Kokab
Off .Telephone: +92-091-9216524 Ext: 3148
Res: +92-091-9216336
E-mail: ---
Office No: 05

Estate Officer:
Zia-ud-Din
Off .Telephone: +92-091-9216524 Ext: 3151
Res: +92-091-9216332
E-mail: ---
Office No: 18